One 8D case for every complaint, audit finding and internal problem. Each step is gated, containment stays until the fix is proven, and an effectiveness review follows every closure.
Gates on every discipline
Containment lifted only after proof
Lessons flagged on the PFMEA
CAPA-000231 · Generic 8D · Full 8DCustomer complaint
Seal leak at end-of-line test, pump housing
D0D1D2D3D4D5D6D7D8
D4 Find root causes · due 17 Mar 09:00
D3 ContainmentStays until a proof passes
C1Finished goods · Active1,240 checked · 3 NOK
C2At customer · Active600 checked · 0 NOK
D4 Root causes
OC-1Chamfer below drawing minimum pinches the O-ringTechnical · OccurrenceVerified
ND-1Leak test limit set above the specificationTechnical · Non-detectionMost likely
SY-1Tool change released without a chamfer checkSystemicPotential
Warning · OC-1: “Was it in the FMEA?” not answered
The method
What is CAPA and the 8D method?
CAPA (corrective and preventive action) removes the cause of a problem that has happened so it cannot happen again, and carries the lesson to the products, processes and sites where it could happen next. 8D (Eight Disciplines) is the team method automotive customers expect for it: IATF 16949 clause 10.2.3 asks for containment, root-cause analysis, systemic corrective action, verified effectiveness and an updated PFMEA and Control Plan.
Zometric runs nine steps, D0 to D8: intake and triage, team, problem description, containment, root causes, selecting and testing actions, implementing and proving them, preventing recurrence, and closure with team recognition. D0 decides between a full 8D and a short form. The same steps can be shown in the VDA 8D or AIAG CQI-20 wording.
A verified root cause must explain the facts and, where possible, switch the problem on and off. Causes are split into why the defect occurred and why it was not detected, and into technical and systemic causes, because a fix that only covers the part leaves the process that let it through unchanged.
Why teams switch
Problems Zometric CAPA & 8D removes
Six problems quality teams describe in their own words — and what changes when the 8D is a gated case instead of a form.
01Root cause
Our 8Ds blame the operator, and the problem comes back.
With Zometric
D4 cannot be completed without a verified cause of the occurrence and, in a full 8D, a verified systemic cause — each backed by evidence. The format can also require the non-detection cause.
Root-cause classes and verification
02Containment
Nobody knows when the sorting can stop.
With Zometric
Each containment action records its location, lots, quantities checked and rejected, and a clean point. It can be removed only after a proof after implementation has passed; an override needs the sponsor or a quality manager and a written reason.
Prove before you remove
03Customer formats
Every customer wants the 8D on their own form.
With Zometric
The team works one case. The format sets the step names, required root-cause classes, sign-offs and report layout, and the customer's own 8D workbook is filled from an issued report version.
Customer formats and workbooks
04Deadlines
We miss the 24-hour containment deadline without noticing.
With Zometric
Every step gets a due date counted from when the problem was reported. The team leader is reminded, and a step more than three days overdue is escalated to the quality managers.
Step due dates and escalation
05Prevention
The PFMEA never hears about the complaint.
With Zometric
D7 needs a decision on the PFMEA and the Control Plan. A planned or done decision raises a review flag on the document, and lessons learned, work instructions and similar products become tracked actions.
D7 review flags
06Effectiveness
We closed it, and months later it was back.
With Zometric
Closure schedules an effectiveness review. Repeat complaints since closure appear as recurrence signals, and a failed review reopens the case or starts a linked repeat CAPA.
Effectiveness review
How it works
How an 8D runs in Zometric
Each discipline has its own checks: an open error blocks the step, and a next-step card says what is missing.
01
D0 · Intake and triage
Open and triage the case
A case opens from a customer or supplier complaint, an audit finding, a layered-audit nonconformance or an internal source. Three triage questions suggest a full 8D or a short form; safety, regulatory and critical problems always get a full 8D.
02
D1–D2 · Team and problem description
Form the team and describe the problem
Name a sponsor and a team leader, add members, customer or supplier representatives. Describe the problem as requirement against actual, with 5W2H, IS / IS NOT, the error pattern and checks on similar parts, lines and sites.
03
D3 · Containment
Contain it
Record containment by location — supplier, work in progress, finished goods, in transit, at the customer — with lots, quantities checked and rejected, and dispositions. Use as is and repair need the customer's authorization; suspect product already shipped needs customer notification.
04
D4 · Root causes
Find and verify the root causes
Work with 5-Why, Ishikawa, IS / IS NOT, Pareto, fault tree, decision matrix, multi-vari or a cause-and-effect matrix, and promote the likely cause to a root cause. The PFMEA chains and Control Plan rows of the project sit beside it, so the team can answer “was it in the FMEA?”.
05
D5–D6 · Actions and proof
Select, test and prove the actions
Link corrective and systemic actions to the causes they remove. Fix the acceptance criteria before any result is recorded, test before implementation, then prove after it — optionally against live SPC or inspection data, before and after the change.
06
D7 · Prevent recurrence
Carry the lesson
Decide each prevention target: PFMEA, DFMEA, Control Plan, process flow, work instructions, similar products and processes, other sites, lessons learned or an LPA question. Each decision is done, planned with an owner and date, or not applicable with a reason.
07
D8 · Closure and recognition
Close, sign and review
Submit a closure summary for sign-off by the team leader and sponsor, plus the customer when the complaint requires it; approvals can be signed electronically. Closure schedules the effectiveness review, 90 days later by default.
Want to see CAPA & 8D on your own process?
A 30-minute call covers your products, your customers' requirements and the tools you use today.
What it does
CAPA & 8D Problem Solving — what you actually get.
Each capability is tied to a decision your team is already trying to make.
8D From D0 to D8, With Gates
Each discipline has its own checks, and an open error blocks the step. A next-step card tells the team leader what is needed to move on — so an 8D cannot be closed without a verified root cause backed by evidence.
VDA 8D, CQI-20 and Your Customer's Format
Work the problem once and report it in the format the customer demands. Formats define the steps, labels and report layout — including customer workbooks — without changing how the team solves the problem.
Containment With Lots & Clean Point
Containment actions by location — your plant, in transit, the customer's warehouse — with the affected lots, quantities sorted and dispositions. The clean point is recorded, and containment can only be lifted once the permanent fix is proven, unless the sponsor or a quality manager overrides it with a written reason.
Root Cause: Occurrence and Non-Detection
5-Why, Ishikawa, Pareto, Is / Is-Not, fault tree and decision matrix, each on the case record. Root causes are separated into why the defect occurred and why it escaped, with the related PFMEA and Control Plan context beside them.
D7 Prevention Into PFMEA & Control Plan
Prevention is a decision made against real documents. Choose the PFMEA, Control Plan or process flow the lesson applies to and a review flag is raised on it — the loop from a field failure back to the risk analysis is closed in the system, not in a meeting.
Effectiveness You Have to Prove
An effectiveness review is scheduled at closure. If the problem has come back, the case reopens. A repeat complaint on a closed CAPA raises a flag on it automatically.
Evidence, Sign-Offs & Report Versions
Photos and files on every step, e-signed sign-offs, and numbered report versions — initial, interim and final — frozen as issued. A management-review pack exports the whole CAPA picture to Excel.
Learns From Your Past Cases
Similar past cases, proven root causes and actions that worked are suggested from your own CAPAs and FMEAs, each with a citation. No external LLM is used in this module, and the engineer decides what to accept.
In numbers
When each 8D step falls due
Step due dates count from the moment the problem was reported, not from when someone opened the case. These are the defaults of the VDA 8D, CQI-20 and Generic 8D formats; each can be changed in a duplicated format, and complaint and audit deadlines replace them.
24
Hours to contain (D3)
15
Days to root cause and plan (D4–D5)
60
Days to implement and close (D6–D8)
Problem reported 2 Mar 2026, 09:00 — default due dates, Generic 8D format
Step
Due after
Due on
D0 Prepare and react
Due after24 h
Due on3 Mar 09:00
D1 Team
Due after24 h
Due on3 Mar 09:00
D2 Describe the problem
Due after5 days
Due on7 Mar 09:00
D3 Contain
Due after24 h
Due on3 Mar 09:00
D4 Find root causes
Due after15 days
Due on17 Mar 09:00
D5 Choose and test actions
Due after15 days
Due on17 Mar 09:00
D6–D8 Implement, prevent, close
Due after60 days
Due on1 May 09:00
If D4 is still open on 21 March — more than three days overdue — the reminder is escalated to the quality managers. A complaint's own deadlines replace D3, D4 and D8, and an audit finding uses its response times. Closed on 1 May, the case is due for its effectiveness review on 30 July.
Connected modules
How CAPA & 8D connects to the rest of Zometric
Other modules open cases through CAPA and hear back when they change, so nothing is retyped between them.
Runs the case: triage, the steps, the closure request and the effectiveness review. Receives the reminders for steps due soon or overdue.
Sponsor / champion
Signs the closure with the team leader, and can override a containment removal with a written reason.
Team members
Work the disciplines — problem description, containment, analyses, root causes and actions. Triage and closure stay with the team leader and sponsor.
Quality managers
Manage any case, receive the escalations of overdue steps, sign quality-manager sign-offs and can override a containment removal.
Source owners
Complaint coordinators, audit programme managers and LPA process owners manage the CAPAs opened from their complaints, findings and layered audits.
Suppliers
Answer containment, root causes, actions and implementation for their 8D through the Supplier Portal.
Comparison
Zometric CAPA & 8D vs a spreadsheet or Word 8D template
Zometric CAPA & 8D vs a spreadsheet or Word 8D template
Zometric CAPA & 8D vs a spreadsheet or Word 8D template
Spreadsheet or Word template
Zometric CAPA & 8D
Step gates
Spreadsheet or Word templateAny box can be left empty or vague
Zometric CAPA & 8D52 CAPA rules; open errors block the step and the closure
Root causes
Spreadsheet or Word templateOne free-text box
Zometric CAPA & 8DTechnical and systemic causes of occurrence and non-detection, each verified with evidence
Containment exit
Spreadsheet or Word templateStopped when it feels safe
Zometric CAPA & 8DRemoved only after a passed proof, or overridden with a reason
Due dates
Spreadsheet or Word templateTyped by hand, rarely chased
Zometric CAPA & 8DCounted from the report date, with reminders and escalation
PFMEA and Control Plan
Spreadsheet or Word template"Updated" written in D7
Zometric CAPA & 8DA D7 decision is required and raises a review flag on the document
Customer formats
Spreadsheet or Word templateA different file for each customer
Zometric CAPA & 8DOne case; VDA 8D, CQI-20 or customer formats and workbooks
Effectiveness
Spreadsheet or Word templateRarely checked after closure
Zometric CAPA & 8DReview scheduled at closure; a failed review reopens the case
Versions and sign-off
Spreadsheet or Word template"8D_final_v2" sent by e-mail
Zometric CAPA & 8DNumbered report versions frozen as issued, with electronic signature
Want to see CAPA & 8D on your own process?
A 30-minute call covers your products, your customers' requirements and the tools you use today.
Standards & Compliance
Built for the standards your regulators and customers already require.
8D
VDA 8D
CQI-20
IATF 16949
ISO 9001
Integrations
Data in and out
8D report
The 8D report in VDA 8D, CQI-20 or generic layout on screen, with a print layout for PDF and an Excel workbook with one sheet per discipline.
Customer 8D workbook
Upload the customer's blank 8D workbook, map its cells once, and fill it from any issued report version.
Register and management review
Export the CAPA register with its KPIs, and a management-review pack with trend, sources, cause Pareto, open and closed cases and effectiveness, to Excel.
Catalogue imports
Load customer cause catalogues, format texts and assessment criteria from Excel or CSV.
REST API and webhooks
Cases, steps, team, containment, root causes and sign-offs are available through the REST API, with a webhook when a case changes status.
Better Together
A module that works alongside this one.
Zometric's modules share a single data backbone — adopting more of them compounds the signal-to-noise advantage.
Straight answers to the questions teams ask before a demo.
What is the difference between CAPA and 8D?
CAPA (corrective and preventive action) is the requirement: remove the cause of a problem so it does not come back, and prevent it elsewhere. 8D is a structured team method for doing it, in eight disciplines from team to closure. Zometric runs every CAPA as an 8D case with nine steps, D0 to D8, where D0 decides between a full 8D and a short form.
Which 8D formats does Zometric support?
Zometric ships three formats: VDA 8D, CQI-20 problem solving and a Generic 8D. A format sets the step names, required root-cause classes, verification level, sign-offs, due dates and report layout. Formats can be duplicated and adjusted for a customer, and a customer's own 8D workbook can be filled from an issued report version.
When can a short-form 8D be used instead of a full 8D?
At triage, three questions suggest the approach: whether the cause is known, whether the problem description is complete, and whether the problem exceeds one person. Safety, regulatory and critical problems always get a full 8D, and so do customer complaints unless the format allows a short form. A short form that turns out bigger can be escalated to a full 8D without losing data.
How are 8D due dates set?
Due dates count from when the problem was reported. The default is 24 hours for containment, 15 days for root causes and the action plan, and 60 days for implementation, prevention and closure. A complaint's deadlines or an audit finding's response times replace them, and a step more than three days overdue is escalated to the quality managers.
When can containment be removed?
Only after the corrective actions have a passed proof after implementation. A format can also require the customer's exit approval or a clean period after the clean point. Removing containment earlier needs a sponsor or quality manager and a written reason, which is kept with the record.
How does Zometric verify that a CAPA was effective?
Closure schedules an effectiveness review, 90 days later by default. Repeat complaints since closure appear as recurrence signals, and confirming effectiveness despite them needs a written justification. A failed review reopens the case from the chosen step, or keeps it closed and starts a linked repeat CAPA.
Can suppliers answer an 8D in Zometric?
Yes. Through the Supplier Portal, a supplier answers containment, root causes, corrective actions and implementation from a secure link. Their answers stay proposals: nothing is written into the CAPA until the team accepts them, and accepted root causes start as most likely, not verified.
Does Zometric's AI send our CAPA data to an external AI model?
No. Suggestions for root causes, actions and prevention targets come from a local engine that searches your own past CAPAs and FMEAs, each with a citation. No external LLM is used, and nothing is added to the case until an engineer accepts it.
See CAPA & 8D running on your line.
A 30-minute discovery call. A 2–3 week pilot on real factory data. Then scale at your pace.