Zometric Logo
PPAP · AIAG 4th edition, levels 1 to 5

Could you submit a complete PPAP package today?

PPAP packages built from the records you already keep. Each of the 18 elements checks itself against released documents and results, and says what is missing and why.

  • 18 elements resolved from live records
  • What is missing, and why
  • An e-signed PSW and an online customer decision

Demo request

Tell us about your factory.

30-minute call, zero obligation. We map the right Zometric modules to your KPIs and priority areas.

Prefer to talk now?

Free trial request

Try Zometric on your own process.

Tell us a little about your plant. Our team will contact you to set up a free trial around the modules you need.

Prefer to talk now?

PPAP-000042 · Pump housing · Initial submission
ElementsLevel 3 · AIAG PPAP 4th ed.
13/16 applicable
E04Design FMEANot design responsibleSN/A
E05Process Flow DiagramsRev R3 · currentSComplete
E06Process FMEAHolds R4 · R5 releasedSIn progress
E07Control PlanRev R2 · currentSComplete
E08MSA studies6/6 gauges acceptableSComplete
E09Dimensional Results46/48 results enteredSIn progress
E15Master SampleMS-01 · Cav 1, Cav 2RComplete
E06 · What's missing: the package holds R4 but R5 is the current release. Update to the current revision.
Part Submission Warrant11/11 fieldsReady to e-sign

Demo request

Tell us about your factory.

30-minute call, zero obligation. We map the right Zometric modules to your KPIs and priority areas.

Prefer to talk now?

Free trial request

Try Zometric on your own process.

Tell us a little about your plant. Our team will contact you to set up a free trial around the modules you need.

Prefer to talk now?

The method

What is PPAP?

The Production Part Approval Process (PPAP) is how an automotive supplier shows its customer that it has understood every requirement of the design record and specifications, and that its production process makes conforming parts. The reference is the AIAG Production Part Approval Process manual, 4th edition (2006). A submission ends with the Part Submission Warrant (PSW), which the supplier signs and the customer approves, rejects or approves on an interim basis.

The manual defines 18 elements: design record, engineering change documents, customer engineering approval, design FMEA, process flow diagrams, process FMEA, control plan, measurement system analysis studies, dimensional results, material and performance test results, initial process studies, qualified laboratory documentation, the Appearance Approval Report (AAR), sample product, master sample, checking aids, records of compliance with customer-specific requirements, and the PSW. Bulk materials add the bulk material checklist.

The submission level, 1 to 5, decides which elements go to the customer and which stay on file. Level 1 sends only the warrant, plus the AAR for appearance items. Level 3, the usual default, sends the warrant with most of the supporting data. At Level 5 everything is kept on file for review at the supplier's site.

Why teams switch

Problems Zometric PPAP removes

Six problems supplier quality teams describe in their own words, and what changes when the package is built from linked records.

Assembly

Every PPAP starts with chasing files across shared drives.

With Zometric

Each element resolves against the record that proves it: the released process documents, the characteristic register, the gauges, the results and the samples. You see what is complete, what is missing and the rule it fails, with a link to fix it.

Live element resolution
Revisions

The PFMEA in the package isn't the one we released.

With Zometric

The DFMEA, process flow, PFMEA and Control Plan elements hold released revisions only. When a newer revision is released, the element says so and updates in one step. This check cannot be waived: the package cannot be marked ready until it holds the current release.

Current-revision check
Results

Dimensional results were typed against an old drawing.

With Zometric

Result rows are generated from the register's dimensional characteristics for every stream and sample. OK or NOT OK is calculated from the register limits, and a spec change flags any result measured against the old one.

Register-driven results
Capability

Our capability studies don't match what the customer asked for.

With Zometric

Studies for special characteristics are classified as above 1.67, 1.33 to 1.67 or below 1.33, and can be imported from shop-floor SPC data. The customer's agreed index, Ppk or Cpk, is checked against every study.

Capability classification
Approval

The customer's approval is buried in an email thread.

With Zometric

The customer's reviewer accepts or rejects each element and decides on the warrant through the Supplier Portal. Interim approvals record the non-compliances, containment, quantity and expiry, with reminders 14 and 3 days before they expire.

Portal review and interim approvals
Changes

A change after approval quietly invalidates the PPAP.

With Zometric

When an engineering change is applied to a part with an approved PPAP, the latest approved submission gets a review flag. The change evaluation checks the PPAP notification and submission triggers and can open the resubmission.

Change evaluation
How it works

How a PPAP submission runs in Zometric

One workspace per submission, from the element plan to the customer's decision.

  1. Step 1 · Create

    Start the submission

    Choose the part, the customer and the reasons for submission. The level comes from the customer profile, and a preview shows which elements are submitted or retained. Elements that don't apply are marked with the reason, for example "not an appearance item".

  2. Step 2 · Evidence

    Link and assign the elements

    The DFMEA, process flow, PFMEA and Control Plan elements link to their released revisions. Other elements take files, records or a confirmation. Each element can have an owner and a due date, and open elements show up in the owner's inbox.

  3. Step 3 · Results

    Enter the results

    Generate the dimensional result rows from the register and mark one measured part as the master sample. Material and performance tests record actual values and the laboratory. A blanket "OK" or "conforms" is flagged as an error.

  4. Step 4 · Studies

    Prove capability and measurement

    Add initial process studies for special characteristics, or import them from the shop floor for the significant run. The gauges come from the Control Plan rows, each shown with its MSA result.

  5. Step 5 · Warrant

    Record the run and sign the PSW

    Record the significant production run: quantity, hours, the seven production conditions and every Control Plan check. The PSW fills in from the part, revision, plant, customer and run data. It is then e-signed, with the signer re-entering their password.

  6. Step 6 · Check and submit

    Check and submit

    36 PPAP rules check the package. Open errors block "Ready to submit". Submitting freezes a snapshot of exactly what was sent. A Level 1 package for a self-certifying customer is approved on submission.

  7. Step 7 · Decision

    Record the customer's decision

    The customer's reviewer decides element by element, then approves the warrant, rejects it or grants interim approval. The package status follows the warrant. A rejection or interim approval leads to a resubmission linked to the original.

Want to see PPAP on your own process?
A 30-minute call covers your products, your customers' requirements and the tools you use today.

Demo request

Tell us about your factory.

30-minute call, zero obligation. We map the right Zometric modules to your KPIs and priority areas.

Prefer to talk now?

What it does

PPAP — what you actually get.

Each capability is tied to a decision your team is already trying to make.

18 Elements, Resolved Live

Design records, change documents, DFMEA, process flow, PFMEA, Control Plan, MSA, dimensional results, material and performance tests, capability studies and the rest — the DFMEA, process flow, PFMEA and Control Plan elements hold their released revisions, and the rest resolve against the live part, register, gauges, results and samples, each with its provenance.

"What's Missing — and Why"

Every incomplete element says exactly what is absent, the rule it fails and the link to fix it. The week before submission stops being an archaeology project across shared drives.

Submission Levels & Customer Matrix

Levels 1 to 5 with the standard retain / submit matrix, plus customer-specific matrices for the OEMs that ask for more. Each element is marked submit or retain for this customer at this level, and only submitted elements block the package.

Dimensional, Material & Capability Results

Dimensional results are judged OK or not OK against the limits in the characteristic register — never against a retyped spec. Capability for special characteristics can be pulled from the shop floor, and a changed spec flags the results measured against the old one.

PSW With E-Signature

The Part Submission Warrant is pre-filled from part, revision and plant master data, then signed with an e-signature. Print the full package, or hand over a manifest of every revision it was built from.

Customer Review & Interim Approvals

The customer's reviewer decides element by element and signs the PSW through the Supplier Portal. Interim approvals carry their conditions and expiry date, with reminders before they lapse.

Change Triggers & Significant Runs

An engineering or process change is evaluated for whether it requires resubmission, so a PPAP is never invalidated quietly. Significant production runs are recorded with their quantity, hours, production conditions and every Control Plan check performed.

In numbers

What each submission level sends to the customer

The standard level matrix comes from Table 4.2 of the AIAG PPAP manual, 4th edition. S means submit to the customer and keep a copy. R means keep it on file, available on request. * means keep it on file and submit it on request. The design record has two rows: proprietary details and all other details.

18
Elements
5
Levels
3
Usual default level
Standard PPAP level matrix, grouped by elements with the same requirement
ElementsL1L2L3L4L5
Part Submission Warrant, bulk material checklistL1SL2SL3SL4SL5R
Appearance Approval ReportL1SL2SL3SL4*L5R
Design record (all other details), engineering change documents, dimensional results, material and performance test results, laboratory documentation, sample productL1RL2SL3SL4*L5R
Customer engineering approval, DFMEA, process flow diagrams, PFMEA, control plan, MSA studies, initial process studies, customer-specific requirement recordsL1RL2RL3SL4*L5R
Design record (proprietary details), master sample, checking aidsL1RL2RL3RL4*L5R
Zometric ships this matrix read-only. For a customer that asks for more, copy it into a customer-specific matrix and edit any cell. Once a submission uses a matrix it is locked, and you copy it again to change it. Changing a submission's level recalculates the requirement of every element.
Who uses it

Who works in it

Quality engineers and project leads

Create and edit submissions, sign the PSW, submit the package, record the customer's decision, manage interim approvals and evaluate changes.

Process engineers

Create and edit submissions, own elements and their evidence, and evaluate whether a change needs a resubmission.

Design engineers

Evaluate whether an engineering change needs customer notification or a resubmission.

Management

Can sign the Part Submission Warrant for the organisation.

Customer reviewers

Accept or reject each element and decide on the warrant through the Supplier Portal, on packages shared with them for approval.

Sub-tier suppliers

Add evidence and files to the elements of an incoming PPAP through a Supplier Portal task.

Comparison

Zometric PPAP vs a folder of files

Zometric PPAP vs a folder of files
Zometric PPAP vs a folder of filesFolder of files and spreadsheetsZometric PPAP
Element evidenceCopies gathered into a folder or binderEach element linked to the live record that proves it
Document revisionsNo way to tell whether a copy is still currentReleased revisions only; a newer release is flagged
Submission levelLooked up in the manual for each packageLevel matrix sets submit or retain per element, with customer-specific matrices
Dimensional resultsSpecs retyped into the results sheetOK or NOT OK calculated from the register limits; spec changes flagged
GapsOften found by the customer36 PPAP rules check the package; open errors block submission
WarrantFilled in by hand and signed on paperFilled in from master data and e-signed
Customer decisionEmail and a scanned warrantElement-by-element review and warrant decision through the Supplier Portal
Record retentionFolders can be deleted or overwrittenRetention date calculated; the package cannot be deleted before it
Want to see PPAP on your own process?
A 30-minute call covers your products, your customers' requirements and the tools you use today.

Demo request

Tell us about your factory.

30-minute call, zero obligation. We map the right Zometric modules to your KPIs and priority areas.

Prefer to talk now?

Standards & Compliance

Built for the standards your regulators and customers already require.

  • AIAG PPAP 4th Edition
  • IATF 16949
  • AIAG MSA Manual
  • AIAG SPC Manual
  • AIAG APQP
Integrations

Data in and out

Print package

An index page followed by every applicable form: PSW, dimensional, material and performance results, and the AAR, ready to print or save as PDF.

Package manifest

A JSON manifest of every element, linked revision, PSW field, result and decision, with a SHA-256 checksum so the customer can verify what was sent.

Excel workbook

The PSW, the element list and the dimensional results of a submission, downloaded as one Excel workbook.

REST API

Submissions, elements, evidence, the PSW, results, studies, interim approvals, level matrices, significant runs and change evaluations. Signing and customer decisions require the signer's password.

FAQ

PPAP: frequently asked questions

Straight answers to the questions teams ask before a demo.

What is a PPAP?

PPAP stands for Production Part Approval Process. It is the package an automotive supplier sends to show its customer that it meets every design and specification requirement, and that its production process makes conforming parts. The reference is the AIAG PPAP manual, 4th edition. The package ends with the Part Submission Warrant (PSW), which the customer approves, rejects or approves on an interim basis.

What are the 18 PPAP elements?

Design record, engineering change documents, customer engineering approval, design FMEA, process flow diagrams, process FMEA, control plan, MSA studies, dimensional results, material and performance test results, initial process studies, qualified laboratory documentation, Appearance Approval Report, sample product, master sample, checking aids, records of compliance with customer-specific requirements, and the Part Submission Warrant. Bulk materials also need the bulk material checklist.

What is the difference between PPAP levels 1 to 5?

The level decides what is sent to the customer and what stays on file. Level 1 sends only the warrant, plus the AAR for appearance items. Level 2 adds the design record, change documents, dimensional and test results, laboratory documentation and sample product. Level 3 also sends the customer engineering approval, FMEAs, process flow, control plan, MSA, initial process studies and customer-specific requirement records. At Level 4 only the warrant is sent and the rest is submitted on request. At Level 5 everything is kept for review at the supplier's site.

Can we use a customer-specific PPAP level matrix?

Yes. Zometric ships the standard AIAG Table 4.2 matrix read-only. You can copy it for a customer and change any element at any level to submit, retain, or retain and submit on request. A matrix is locked once a submission uses it, so packages never change after the fact.

How does Zometric know whether a PPAP element is complete?

Each element has a rule. For example, the PFMEA element must hold the current released revision, every gauge on the Control Plan needs an acceptable MSA result, and every dimensional characteristic needs a result for every stream and sample. Incomplete elements say what is missing and link to where to fix it, and open errors block "Ready to submit".

Can our customer approve the PPAP online?

Yes. Through the Supplier Portal, the customer's reviewer accepts or rejects each element and then approves the warrant, rejects it or grants interim approval. The package status follows the warrant decision. A decision received on paper can also be recorded internally with an e-signature.

What happens to an approved PPAP after an engineering change?

When an engineering change is applied to a part with an approved PPAP, Zometric raises a review flag on the latest approved submission. A change evaluation checks the PPAP notification and submission triggers, records any customer waiver, and can create the resubmission with the reasons already filled in.

Can we request PPAPs from our own suppliers?

Yes. A submission can be outgoing to your customer or incoming from your supplier. For an incoming PPAP, the supplier gets a Supplier Portal task and adds evidence and files to each element. You then review the package in the same workspace.

See PPAP running on your line.

A 30-minute discovery call. A 2–3 week pilot on real factory data. Then scale at your pace.

Demo request

Tell us about your factory.

30-minute call, zero obligation. We map the right Zometric modules to your KPIs and priority areas.

Prefer to talk now?

Free trial request

Try Zometric on your own process.

Tell us a little about your plant. Our team will contact you to set up a free trial around the modules you need.

Prefer to talk now?

Talk to an engineer