Zometric Logo

Module 20 · Quality

Could you submit a complete PPAP package today — and show where every element came from?

A PPAP package that assembles itself. Nothing is copied into a binder: each of the 18 elements resolves against the released Process Flow Diagram, PFMEA, Control Plan, measurement and capability data already in Zometric. The package tells you what is missing, why, and where to fix it.

Demo request

Tell us about your factory.

30-minute call, zero obligation. We map the right Zometric modules to your KPIs and priority areas.

Prefer to talk now?

See all modules

What it does

PPAP — what you actually get.

Six capabilities, each tied to a decision your team is already trying to make.

18 Elements, Resolved Live

Design records, change documents, DFMEA, process flow, PFMEA, Control Plan, MSA, dimensional results, material and performance tests, capability studies and the rest — each element points at the released revision of the real record, with its provenance.

"What's Missing — and Why"

Every incomplete element says exactly what is absent, the rule it fails and the link to fix it. The week before submission stops being an archaeology project across shared drives.

Submission Levels & Customer Matrix

Levels 1 to 5 with the standard retain / submit matrix, plus customer-specific matrices for the OEMs that ask for more. The package shows only what this customer, at this level, actually requires.

Dimensional, Material & Capability Results

Dimensional results are judged OK or not OK against the limits in the characteristic register — never against a retyped spec. Capability for special characteristics can be pulled from the shop floor, and a changed spec flags the results measured against the old one.

PSW With E-Signature

The Part Submission Warrant is pre-filled from part, revision and plant master data, then signed with an e-signature. Print the full package, or hand over a manifest of every revision it was built from.

Customer Review & Interim Approvals

The customer's reviewer decides element by element and signs the PSW through the Supplier Portal. Interim approvals carry their conditions and expiry date, with reminders before they lapse.

Change Triggers & Significant Runs

An engineering or process change is evaluated for whether it requires resubmission, so a PPAP is never invalidated quietly. Significant production runs are recorded with the evidence they produced.

Standards & Compliance

Built for the standards your regulators and customers already require.

  • AIAG PPAP 4th Edition
  • IATF 16949
  • AIAG MSA Manual
  • AIAG SPC Manual
  • AIAG APQP

See PPAP running on your line.

A 30-minute discovery call. A 2–3 week pilot on real factory data. Then scale at your pace.

Demo request

Tell us about your factory.

30-minute call, zero obligation. We map the right Zometric modules to your KPIs and priority areas.

Prefer to talk now?

Talk to an engineer