Zometric Logo
Control Plan · AIAG CP 2024 · Prototype to Production

Does your Control Plan change when the PFMEA does?

Control Plans generated from the process flow and the PFMEA's controls, on the AIAG 2024 form. When the risk analysis moves, a sync preview shows what would change, and nothing typed by hand is overwritten.

  • Rows generated from flow and PFMEA
  • A sync preview, never a silent overwrite
  • The released revision at every station

Demo request

Tell us about your factory.

30-minute call, zero obligation. We map the right Zometric modules to your KPIs and priority areas.

Prefer to talk now?

Free trial request

Try Zometric on your own process.

Tell us a little about your plant. Our team will contact you to set up a free trial around the modules you need.

Prefer to talk now?

CP-PP-9001-PRODWindow lifter electric motorPrototypePre-LaunchProduction
PFMEA changed · preview+1 row1 to review
OP10
P-102Pole housing bearing seat diameter8.000 ±0.015 mm
Control methodReceiving inspection per QI-RCV-02
Sample · frequency5 pcs · each lot
Reaction · ownerA-RP-REC · Receiving Inspector
OP30
P-101◇Axial position of sintered bearing≤ 0.200 mm
Control methodPress force set per machine data sheet; 100% motor performance curve check at EOL
Sample · frequency1 pc · every 50 parts
Reaction · ownerA-RP-POS · Line Leader
OP50
P-104Motor performance curveWithin envelope, TS-EOL-5038
Control methodAutomated EOL test; NOK motors locked in red bin
Sample · frequency100% · every piece
Reaction · ownerA-RP-EOL · Test Technician
Floor: In place · Inspection
Derived from PFMEAOverrideAuthored

Demo request

Tell us about your factory.

30-minute call, zero obligation. We map the right Zometric modules to your KPIs and priority areas.

Prefer to talk now?

Free trial request

Try Zometric on your own process.

Tell us a little about your plant. Our team will contact you to set up a free trial around the modules you need.

Prefer to talk now?

The method

What is a Control Plan?

A Control Plan is the written description of how a supplier controls its product and process characteristics. For every operation it states which characteristic is checked, against what specification, with which gauge or method, how many parts how often, and what happens when a check fails. Automotive customers expect one for every part made under IATF 16949, and they review it in APQP and PPAP.

AIAG's Control Plan manual (first edition, 2024) gives the plan a reference manual of its own; it was previously an appendix of the APQP manual. Its B-1 form has thirteen header fields and thirteen row fields, numbered 14 to 26, from the operation number to the reaction plan and its owner. Plans are written for the Prototype, Pre-Launch and Production phases, and Safe Launch adds temporary controls for the ramp-up.

The Control Plan is where the process flow and the PFMEA reach the shop floor: every current prevention and detection control the PFMEA counts on should appear on it, and every special characteristic must. That is why Zometric generates the plan from those documents instead of retyping it, and keeps it in sync when they change.

Why teams switch

Problems Zometric Control Plan removes

Six problems quality teams describe in their own words, and what changes when the Control Plan is built from the same records as the PFMEA.

Linkage

Our Control Plan was retyped from the PFMEA, and nobody knows if it still matches.

With Zometric

Rows are generated from the process flow and the PFMEA, and every field shows where it came from: derived, overridden or authored. A PFMEA control that never reached the plan is flagged.

Generated from the PFMEA
Change

Every PFMEA update means redoing the Control Plan, and someone's edits get lost.

With Zometric

A sync preview lists the rows added, the controls changed, the overrides gone stale and the rows orphaned before anything is applied. What an engineer typed is kept, and nothing is deleted by a sync.

Sync preview
Reaction

Our reaction plans just say "notify the supervisor".

With Zometric

Rows pick from a library of reaction plans written as contain, stop and restore, each with one owner. Checks flag a missing plan, a missing owner, two owners on one row, and text that only says to notify someone.

Reaction plan library
Sampling

Nobody can say why the sample is five pieces, or how many parts are suspect when a check fails.

With Zometric

A sampled row needs its statistical basis, such as an ISO 2859-1 table or an SPC subgroup. The row editor turns the frequency and the step's cycle time into the number of parts made between two checks.

Sampling checks
Shop floor

Operators work from a printout that is two revisions old.

With Zometric

Each station opens its own view from a QR code, showing only the released values for that operation. Rows added after the release stay off the floor until the next release.

Station view
Operations

The Control Plan says SPC, but nobody ever set up the chart.

With Zometric

Releasing a Production plan offers its data-collecting rows to SPC and Inspection, where operations sets each one up, links an existing check or declines with a reason. Every row then shows whether it is really running.

Hand-off to operations
How it works

How a Control Plan runs in Zometric

The plan is generated, completed, checked and released, then kept in sync as the process flow and the PFMEA change.

  1. Inputs · Process flow and PFMEA

    Decide what the plan covers

    Mark the operations that belong in the Control Plan in the process flow, link their characteristics from the characteristic register, and mark which PFMEA controls are carried to the Control Plan.

  2. Generate · Fields 1–21

    Generate the plan

    Choose the phase and an optional filter: a minimum Action Priority, special characteristics only, or prevention or detection controls. Zometric writes one row per characteristic at each operation, a verification row per error-proofing device and per 100% visual inspection, and marks rework rows. Special characteristics are never filtered out.

  3. Complete · Fields 22–26

    Add sampling and reactions

    Set the gauge or evaluation technique, the sample size and frequency with their statistical basis, the control method and what data it collects, then pick a reaction plan from the library. Zometric proposes the control method from the PFMEA's detection controls.

  4. Phases · Prototype, Pre-Launch, Production

    Carry it through the phases

    A Pre-Launch plan can start from the Production plan's sampling and reactions, and is flagged until it adds controls of its own. Rework, repair and interdependent-process plans are generated from the process flow, and Safe Launch controls run in a separate plan with exit criteria.

  5. Validate

    Check and fix

    More than fifty rules check the plan against the manual, many with a one-click fix, and the B-2 checklist answers itself where a rule can. Open errors block the release until they are fixed or waived with a reason.

  6. Release

    Release and approve

    Release freezes a revision, through an approval route with electronic signature when one is set up. Customer approvals are recorded on the plan or given through the Supplier Portal, and a new Production revision asks the customer again when their profile requires it.

  7. Production

    Run it on the floor

    The released Production plan is offered to SPC and Inspection, and each station opens its view from a QR code. Operators verify error-proofing devices there; a failed verification needs the reaction taken and opens an action.

  8. Change

    Keep it in sync

    When the process flow or the PFMEA changes, the sync preview shows the effect. Syncing a released plan moves it to "Changed after release", while the released revision stays on the floor until the next release.

Want to see Control Plan on your own process?
A 30-minute call covers your products, your customers' requirements and the tools you use today.

Demo request

Tell us about your factory.

30-minute call, zero obligation. We map the right Zometric modules to your KPIs and priority areas.

Prefer to talk now?

What it does

Control Plan — what you actually get.

Each capability is tied to a decision your team is already trying to make.

Generated From the PFMEA

Characteristics, controls and methods flow in from the PFMEA and the process flow. Every field shows its provenance — derived, overridden or authored — so a reviewer can see at a glance what came from the risk analysis and what was added on the floor.

Sync Preview, Not Silent Overwrite

When the PFMEA changes, the Control Plan shows the difference before anything is applied: rows added, controls changed, overrides gone stale, rows orphaned. Apply it in one click. Authored fields are never touched.

Prototype, Pre-Launch, Production & Safe Launch

All three Control Plan phases from the same process definition, plus Safe Launch controls with exit criteria for the ramp-up. Pass-through characteristics get their own register, so nothing the customer sees is left unowned.

Reaction Plan Library

Standard reaction plans written once and referenced on every row that needs them. A row without a reaction plan is flagged before release — not discovered by the operator at 2 a.m.

Station View for the Shop Floor

Each station gets its own tablet view of exactly the controls it must run, opened from a QR code. The operator sees the current released revision — never a printout from two changes ago.

Hand-Off to SPC & Inspection

Engineering offers each control to operations, and operations sets it up, links an existing check or declines with a reason. The Control Plan row then shows whether the control is really running in In-Process Quality & SPC or Inspection. Connected, not coupled.

Linkage Checks & Release

More than fifty checks — a special characteristic missing from the plan, a gauge with no measurement system study, a row the PFMEA no longer supports — many with a one-click fix. Release through an approval route, with e-signature when one is set up and a customer re-approval prompt when it is required.

In numbers

How many parts are at risk between two checks?

When a check fails, every part made since the last good check is suspect. The row editor turns the frequency in field 23 into that number using the cycle time of the process step: the interval divided by the cycle time, rounded up, with a shift counted as 480 minutes.

12 s
Cycle time
300
Parts per hourly check
2,400
Parts per shift check
One operation with a 12-second cycle time: parts made between two checks
FrequencyParts between checksBased on
Every pieceParts between checks1Based onQuantity
Every 50 partsParts between checks50Based onQuantity
Every 30 minutesParts between checks150Based onTime
Every hourParts between checks300Based onTime
1 per shiftParts between checks2,400Based onTime
If the check itself takes longer than the interval, the editor gives the minimum interval: a 15-minute check at a 12-second cycle needs at least 75 parts between checks, and parts made since the last good check are held until the result is known. A time-based frequency on a sampled row is flagged, because frequencies should follow the quantity produced.
Connected modules

How the Control Plan connects to the rest of Zometric

Rows point to the same operations, characteristics and controls as the other documents, so nothing is retyped between them.

Who uses it

Who works in it

Quality engineer, Control Plan owner

Generates and completes the plan, records approvals, runs Safe Launch, sends the plan to operations and releases it.

Process engineers and project leads

Generate, edit and sync plans and release them. Project leads can also record approvals, run Safe Launch and send plans to operations.

Management

Approves the exit from a Safe Launch once its clean days and criteria are met.

Operations

Sets up, links or declines each control offered to SPC and Inspection, giving a reason when it declines.

Customer reviewers

Review the plan and approve, approve with comments or reject it through the Supplier Portal.

Comparison

Zometric Control Plan vs a spreadsheet template

Zometric Control Plan vs a spreadsheet template
Zometric Control Plan vs a spreadsheet templateSpreadsheet templateZometric Control Plan
RowsRetyped from the PFMEAGenerated from the process flow and the PFMEA, one per characteristic and operation
PFMEA changesFound by comparing two filesSync preview of added, changed, stale and orphaned rows
Your own editsOverwritten by the next copyNever overwritten; flagged for review when the source moves
Special characteristicsSymbol typed by handSymbol from the characteristic register, in the customer's symbol where agreed
Reaction plansFree text on each rowLibrary plans with contain, stop, restore and one owner
ChecksNoneMore than 50 rules; open errors block the release
Shop floorPrintoutsStation view of the released revision, opened from a QR code
SPC and inspectionSet up separately and left to driftHand-off to operations, with floor status on every row
Want to see Control Plan on your own process?
A 30-minute call covers your products, your customers' requirements and the tools you use today.

Demo request

Tell us about your factory.

30-minute call, zero obligation. We map the right Zometric modules to your KPIs and priority areas.

Prefer to talk now?

Standards & Compliance

Built for the standards your regulators and customers already require.

  • AIAG Control Plan
  • IATF 16949
  • AIAG APQP
  • AIAG-VDA FMEA Handbook
  • AIAG PPAP
Integrations

Data in and out

Excel import

Bring legacy Control Plans in from the AIAG 2024 B-1 layout or the older APQP layout. Imported rows are matched to generated rows, never duplicated.

Excel round trip

Export a plan for editing in Excel and re-import it, with a cell-by-cell comparison that shows conflicts before anything is applied.

B-1, B-2 and B-3 exports

The B-1 form in Excel with customer export templates, up to eight extra columns and change bars since an earlier revision, plus the B-2 checklist, the B-3 worksheet and a print layout.

REST API

Control Plans, generation, sync preview and apply, rows and approvals are available through the REST API.

FAQ

Control Plan: frequently asked questions

Straight answers to the questions teams ask before a demo.

Which Control Plan standard does Zometric follow?

Zometric follows the AIAG Control Plan manual published in 2024. Plans use its B-1 form with header fields 1 to 13 and row fields 14 to 26, its 21-question B-2 checklist, and its Prototype, Pre-Launch and Production phases. The validation rules cite the section of the manual they come from.

How is the Control Plan generated from the PFMEA?

Zometric writes one row for each characteristic at each operation marked for the Control Plan, taken from the process flow and from the PFMEA's failure modes and causes. Each row carries the current PFMEA controls marked "Carried to Control Plan". Error-proofing devices and 100% visual inspections get their own verification rows.

What happens to the Control Plan when the PFMEA changes?

Nothing changes until someone applies the sync. The sync preview lists rows to add, controls that changed, overridden values whose source moved, and rows whose source was removed. Values typed by engineers are kept, affected rows get a review flag, and no row is deleted.

Can a special characteristic be left off the Control Plan?

No. Special characteristics are never filtered out of a generated Control Plan, even when the plan is limited to a minimum Action Priority. A special characteristic missing from the plan is reported as an error, and field 20 shows its symbol, or the customer's symbol where one has been agreed.

Does Zometric support Safe Launch?

Yes. Safe Launch controls run in a separate plan linked to the Pre-Launch or Production plan, with tighter sampling or extra checks at any operation. A clean-day counter, 90 days by default, resets on logged issues, and the exit needs management approval and, when required, the customer's authorization.

How do operators see the Control Plan at their station?

Each operation has a station view opened from a QR code, showing that operation's released checks, specifications, gauges and reaction plans. It can show a second language next to English. Rows added after the last release do not appear until the plan is released again.

How does the Control Plan reach SPC and inspection?

When a Production Control Plan is released, its data-collecting rows are offered to the SPC and Inspection modules. Operations sets each one up, links an existing check or declines it with a reason. Every row then shows its floor status, such as pending, in place, declined or drift.

Can we import our existing Excel Control Plans?

Yes. Control Plans can be imported from the AIAG 2024 B-1 layout or the older APQP layout, and imported rows are matched to the generated rows instead of duplicated. A plan can also be exported for editing in Excel and re-imported with a cell-by-cell comparison.

See Control Plan running on your line.

A 30-minute discovery call. A 2–3 week pilot on real factory data. Then scale at your pace.

Demo request

Tell us about your factory.

30-minute call, zero obligation. We map the right Zometric modules to your KPIs and priority areas.

Prefer to talk now?

Free trial request

Try Zometric on your own process.

Tell us a little about your plant. Our team will contact you to set up a free trial around the modules you need.

Prefer to talk now?

Talk to an engineer