Gauge Master & Inventory
A centralised register of every gauge across every plant and location. One record per gauge with location, owner, calibration cycle, current status and full document history.
Module 04 · Quality
Before SPC means anything, the measurement system has to. One register for every gauge across every site, calibration schedules that don't slip, and AIAG-format GRR studies on the same dataset your CTQs are measured against.
What it does
Six capabilities, each tied to a decision your team is already trying to make.
A centralised register of every gauge across every plant and location. One record per gauge with location, owner, calibration cycle, current status and full document history.
Auto-alerts for due calibrations, certificate management, status tracking — in-service, due, rejected. Nothing falls through the cracks because nothing depends on a spreadsheet someone forgot to update.
Crossed and nested GRR, Type 1 GRR, Linearity & Bias, Attribute Agreement Analysis. Standard and AIAG-format reports, ready for the customer's quality engineer to sign off.
Complete history per gauge — who calibrated, when, with what reference, against which standard, with what result. Built for IATF 16949 and 21 CFR Part 11 audits.
Manage gauges across plants and geographies from a single dashboard. Corporate quality can compare gauge populations, calibration compliance and GRR results across sites.
Supports IATF 16949, ISO 9001, 21 CFR Part 11 and the documented measurement-system management other standards expect.
Standards & Compliance
Better Together
Zometric's modules share a single data backbone — adopting more of them compounds the signal-to-noise advantage.
Catch process deviations before they become defects.
The analytical brain — comprehensive statistics engine with AI-generated plain-language interpretations on every output.
Statistically valid lot acceptance — replacing paper and Excel inspection.
Built for regulated pharma. Automates the most resource-intensive compliance activities.
A 30-minute discovery call. A 2–3 week pilot on real factory data. Then scale at your pace.