APQP · AIAG 3rd edition · Gates 0–5

Is your launch really ready for the next gate?

Advanced product quality planning on the AIAG APQP 3rd edition. Deliverables read their status from the live FMEA, Control Plan and PPAP, so gate readiness is calculated, not typed into a tracker.

  • Status read from the live documents
  • Gate readiness with its blockers
  • Critical path to the next gate

Demo request

Tell us about your factory.

30-minute call, zero obligation. We map the right Zometric modules to your KPIs and priority areas.

Prefer to talk now?

Free trial request

Try Zometric on your own process.

Tell us a little about your plant. Our team will contact you to set up a free trial around the modules you need.

Prefer to talk now?

AP-0012 · Steering knuckle · Program cockpit
G0
G1
G2
G3
G4
G5
Gate 3 · Process FeasibilityIn review
83 %Go with conditions
8/10 deliverables13/13 items2 negative · 2 with action
What blocks this gate
D3.05Process FMEA (PFMEA)Draft · 92 % rated, 1 AP H openIn process
D3.06Pre-Launch Control PlanReleased · customer approval pendingIn process
G3.4PFMEANot approvedAction A-000142
G3.5Pre-Launch Control PlanNot approvedAction A-000143
Status read from PFMEA-4120 and CP-4120-PL · leadership approval not yet recorded

Demo request

Tell us about your factory.

30-minute call, zero obligation. We map the right Zometric modules to your KPIs and priority areas.

Prefer to talk now?

Free trial request

Try Zometric on your own process.

Tell us a little about your plant. Our team will contact you to set up a free trial around the modules you need.

Prefer to talk now?

The method

What is APQP?

Advanced Product Quality Planning (APQP) is the structured method automotive suppliers use to plan a product launch, so that every requirement, risk and control is in place before production starts. The AIAG APQP reference manual, now in its 3rd edition (2024), defines the deliverables a cross-functional team produces and the gates where leadership decides whether the program may move on. It is the launch method automotive customers expect from suppliers working to IATF 16949.

The manual starts with Phase 0, Getting Started, and continues through five phases: Plan and Define Program, Product Design and Development, Process Design and Development, Product and Process Validation, and Feedback, Assessment and Corrective Action. Each phase ends at a gate: Program Concept, Program Approval, Design Feasibility, Process Feasibility, Launch Readiness, and Feedback, Assessment & Corrective Action.

In Zometric, a program created from the AIAG APQP 3rd edition template gets all 61 deliverables, gates 0–5 with their 80 gate items, a timing plan and the A-0 risk checklist in one step. Seventeen deliverables are linked to a live document, such as the PFMEA, a Control Plan or the PPAP submission, and take their status from it.

Why teams switch

Problems Zometric APQP removes

Six problems launch teams describe in their own words — and what changes when every deliverable points at the document behind it.

Status

The tracker says green, but the PFMEA is still a draft.

With Zometric

A deliverable linked to a document reads its status from it, with the reason beside it. The PFMEA counts as complete only once it is released and marked complete; until then it shows the share of chains rated and the AP High chains still open.

Live deliverable status
Gate reviews

Gate reviews are a slide deck and a show of hands.

With Zometric

Gate items fill themselves from deliverables, Control Plan approvals, the characteristic register and PPAP. The gate shows its readiness and every blocker, and an unconditional approval is refused while any item is negative.

Gate readiness and decisions
Timing

We find out the gate will slip on the day of the review.

With Zometric

The timing plan calculates the critical path to the next gate. An overdue task pushes its successors, the gate shows its forecast slip in days, and a chain that no longer makes its gate gets negative float.

Timing plan & critical path
Changes

Something changed after the gate and nobody re-checked it.

With Zometric

A deliverable confirmed at an earlier gate that changed afterwards must be re-approved, or accepted with a written reason, before the next gate can be approved. A change after customer approval waits for the customer's re-approval.

Change re-confirmation
Checklists

The APQP checklists get filled in the night before the audit.

With Zometric

A-1, A-6, A-7 and A-10 questions are answered from the FMEA, Process Flow and Control Plan where the evidence exists. A gap answer needs a comment, a responsible and a due date, and then becomes an action.

Checklist engine
Lessons learned

Every launch repeats the last launch's mistakes.

With Zometric

Lessons from a shared library are applied to each program and tracked as implemented, pending or not applicable. Pending lessons appear in the gate items, and a CAPA's prevention step can add a new lesson to the library.

Lessons-learned library
How it works

How an APQP program runs in Zometric

The program follows the phases and gates of the AIAG APQP 3rd edition, so the manual is the workflow.

  1. Phase 0 · Getting Started

    Start the program

    Choose the customer, parts, linked process project and template. Zometric creates the 61 deliverables, gates 0–5, a timing plan with one task per deliverable and a review per gate, and the A-0 checklist. If you are not design responsible, the design deliverables are set not applicable with your agreement reference.

  2. Phase 0 · Getting Started

    Assess program risk

    Answer the 45 questions of the A-0 Risk Factors checklist. Six or more gaps set the program risk level to High and three or more to Medium.

  3. Phase 1 · Plan and Define Program

    Plan the timing and capacity

    Set dates, dependencies and customer milestones, capture a baseline and let the team acknowledge the plan. Record the capacity plan with its OEE and utilisation check, the program risk register and the supplier list.

  4. Phases 2–3 · Design and process development

    Link the live documents

    DFMEA, Process Flow Diagram, PFMEA, Control Plans and the special characteristics are linked to their deliverables and report their own status. Overriding a derived status needs a written reason.

  5. Gate 2 · Design Feasibility

    Commit to feasibility

    Complete the App. D Team Feasibility Commitment and record its conclusion. Each team member signs it with an electronic signature, and Gate 2 cannot be approved without a conclusion.

  6. Phase 4 · Product and Process Validation

    Validate the launch

    The significant production run, PPAP submission and Production Control Plan report their status from PPAP and the Control Plan. A quality planning sign-off dated after the first shipment is flagged at Gate 4.

  7. Gates 0–5 · Gate review

    Review and decide the gate

    Open the review and the items fill themselves from the live data. Negative items get action plans, members add their e-signed approval, and the gate is decided Go, Go with conditions or No-go once a leadership representative has approved.

  8. Phase 5 · Feedback, Assessment and Corrective Action

    Feed back and change

    Record lessons learned for the next program. An engineering change after launch opens a change project scoped to the deliverables it affects, with Gates 3 and 4 by default.

Want to see APQP on your own process?
A 30-minute call covers your products, your customers' requirements and the tools you use today.

Demo request

Tell us about your factory.

30-minute call, zero obligation. We map the right Zometric modules to your KPIs and priority areas.

Prefer to talk now?

What it does

APQP — what you actually get.

Each capability is tied to a decision your team is already trying to make.

Program Portfolio at a Glance

Every launch on one screen: current phase, red / yellow / green, next gate and days to it, percent complete, overdue items and open risk. A gate calendar lists the upcoming gate reviews across all programs.

Gates 0–5 With Real Readiness

Each gate has a readiness meter, the list of what blocks it and the critical path to reach it. Decide go, go with conditions or no-go — with e-signed approvals and re-confirmation when something changes after the review.

Deliverables Linked to Live Documents

Deliverables read their status from the Process Flow Diagram, DFMEA, PFMEA, Control Plan and PPAP submission they point at. Release the document (and, for an FMEA, mark it complete) and the deliverable turns green by itself, with the provenance shown beside it.

Timing Plan & Critical Path

A Gantt with baseline, plan and actual, dependencies and customer milestones. Drag a task and the forecast slip on the next gate updates. Late chains show negative float — so the conversation is about recovery, not about whose spreadsheet is right.

A-0 to A-10 Checklists

The A-0 to A-10 checklists, with A-1, A-6, A-7 and A-10 questions answered from the FMEA, Process Flow and Control Plan wherever the evidence exists. A gap answer with a responsible and a due date becomes an action automatically, and a checklist can be issued to a supplier to answer through the Supplier Portal.

Feasibility, Capacity & Risk

Team feasibility commitment, capacity planning with an OEE and utilisation calculator, a program risk register and supplier readiness — the judgement calls of a launch, recorded next to the evidence they were made on.

Customer Reporting & Lessons Learned

A customer status report generated from the same data, OEM-specific templates, change projects for engineering changes after launch, and a lessons-learned library that feeds the next program instead of a slide deck nobody reopens.

In numbers

How gate readiness is calculated

Readiness counts the deliverables confirmed at a gate and the gate's items: completed deliverables plus answered items, minus negative items, divided by the total. The verdict follows fixed rules on top of the percentage, so a high percentage does not by itself mean go. Gate 3, Process Feasibility, confirms 10 deliverables and has 13 gate items.

10
Gate 3 deliverables
13
Gate 3 items
1
Leadership approval to decide
Four Gate 3 reviews: deliverables completed, items answered, negative items and their action plans
CaseDoneAnsweredNegativeNo planReady %Verdict
ADone10Answered13Negative0No plan0Ready %100VerdictGo
BDone8Answered13Negative2No plan0Ready %83VerdictGo with conditions
CDone8Answered13Negative2No plan1Ready %83VerdictNo-go
DDone10Answered11Negative0No plan0Ready %91VerdictNot ready
B and C have the same readiness, but in C one negative item has no action plan with an owner and due date, so it is a no-go. B also needs its two open deliverables to be in progress rather than overdue. D scores higher than both and is still not ready, because two gate items have no result yet.
Who uses it

Who works in it

APQP process owner and team manager

Run the program: edit the timing plan and team, record customer approvals, override a derived status with a reason, and approve and decide gates.

Team members

Work the deliverables, records and gate items, create action plans for negative items and add their e-signed approval to a gate.

Leadership

Approve and decide gates. A gate decision needs at least one leadership approval.

Suppliers

Answer the APQP checklists issued to them through the Supplier Portal and submit them back to the program.

Comparison

Zometric APQP vs a spreadsheet or project tracker

Zometric APQP vs a spreadsheet or project tracker
Zometric APQP vs a spreadsheet or project trackerSpreadsheet or project trackerZometric APQP
Deliverable statusTyped in by whoever updates the fileRead from the linked FMEA, Control Plan or PPAP, with the reason shown
Gate readinessJudged in the meetingCalculated from deliverables and gate items, with every blocker listed
Gate decisionMinutes and signatures on paperGo, Go with conditions or No-go, with e-signed approvals and leadership sign-off
TimingA Gantt chart kept apart from statusOne plan: deliverable progress moves the timing tasks, with critical path and forecast slip
ChecklistsSeparate files per checklistA-0 to A-10 and App. D in the program; gap answers become actions
Changes after a gateRarely noticedRe-approved, or accepted with a reason, before the next gate
Customer reportingAssembled by hand for each reviewStatus report generated from the program, as PDF or Excel
RemindersChased by e-mailOwners reminded 3 days before a due date; escalation after 7 days overdue
Want to see APQP on your own process?
A 30-minute call covers your products, your customers' requirements and the tools you use today.

Demo request

Tell us about your factory.

30-minute call, zero obligation. We map the right Zometric modules to your KPIs and priority areas.

Prefer to talk now?

Standards & Compliance

Built for the standards your regulators and customers already require.

  • AIAG APQP 3rd Edition
  • IATF 16949
  • AIAG Control Plan
  • AIAG PPAP 4th Edition
  • AIAG-VDA FMEA Handbook
Integrations

Data in and out

Customer status report

A status report with phases, gates, customer approvals, red deliverables, high-risk suppliers and open concerns, printable to PDF or downloaded as Excel.

Timing plan export

Download the timing plan as CSV with baseline, planned and actual dates, float, critical path and forecast slip.

Supplier Portal

Issue APQP checklists to suppliers and receive their answers back in the program.

REST API

Programs, deliverables, gates, gate items, approvals, the portfolio, program metrics and the critical path are available through the REST API.

FAQ

APQP: frequently asked questions

Straight answers to the questions teams ask before a demo.

What is APQP?

APQP (Advanced Product Quality Planning) is the structured product-launch method defined in the AIAG APQP manual, now in its 3rd edition (2024). A cross-functional team works through Phase 0 and five phases, producing deliverables such as the DFMEA, PFMEA, Control Plans and PPAP, and leadership approves the program at a gate at the end of each phase.

Which APQP edition does Zometric follow?

Zometric ships a system template for the AIAG APQP 3rd edition (2024) with 61 deliverables, gates 0–5 with 80 gate items, and the A-0 to A-10 checklists plus the App. D Team Feasibility Commitment. Each deliverable carries its manual reference and its obligation, such as MUST or SHOULD.

How does Zometric decide that a deliverable is complete?

Seventeen deliverables are linked to a live document and take their status from it. An FMEA is complete when it is released and marked complete, a Control Plan when it is released and any required customer approval is recorded, and the PPAP deliverable when the submission is approved. Switching a linked deliverable to a manual status needs a written reason.

What is the difference between Go, Go with conditions and No-go?

Go means every gate item is acceptable; an unconditional approval is refused while any item is negative. Go with conditions allows negative items only when each has an action plan with an owner and a due date. No-go stops the program at the gate. Every decision except No-go needs at least one leadership approval, and Gate 2 also needs the Team Feasibility Commitment conclusion.

Can we use our customer's own APQP requirements?

Yes. The system template can be duplicated for a customer, and its deliverables renamed, deactivated or added to. One customer template can be the default, so new programs for that customer start from it automatically.

What if we are not design responsible?

Set the program to not design responsible and enter the reference of the agreement with your customer. The Design FMEA, design verification and design review deliverables are then set not applicable with that reference as the justification, and a check flags a missing agreement reference.

Can suppliers complete APQP checklists in Zometric?

Yes. A checklist such as the A-9 sourcing checklist can be issued to a supplier through the Supplier Portal with a due date. The supplier answers it question by question and submits it, and the answers appear in the program.

How are engineering changes after launch handled?

A post-launch change opens a change project linked to the launched program. It keeps the same customer, parts and template, applies only the deliverables in the change scope, and runs Gates 3 and 4 by default. A PPAP change submission can be linked to it directly.

See APQP running on your line.

A 30-minute discovery call. A 2–3 week pilot on real factory data. Then scale at your pace.

Demo request

Tell us about your factory.

30-minute call, zero obligation. We map the right Zometric modules to your KPIs and priority areas.

Prefer to talk now?

Free trial request

Try Zometric on your own process.

Tell us a little about your plant. Our team will contact you to set up a free trial around the modules you need.

Prefer to talk now?

Talk to an engineer