Zometric Logo

Module 11 · Production

Are you running to plan, and if not — why, exactly?

Automated production logs from Zometric Edge — no manual entry, no data gaps. Real-time Availability, Performance and Quality computed live. Downtime captured automatically, attributed by the operator on a tablet, escalated to maintenance and supervisors before the next shift's handover.

Demo request

Tell us about your factory.

30-minute call, zero obligation. We map the right Zometric modules to your KPIs and priority areas.

A sentence or two is enough — we'll go deeper on the call.

Prefer to talk now?

See all modules

What it does

Production Management — what you actually get.

Six capabilities, each tied to a decision your team is already trying to make.

Automated Production Logs

Machine cycle data captured automatically via Zometric Edge. No manual logging, no data gaps, no end-of-shift reconciliation between paper and reality.

Real-Time OEE

Availability, Performance and Quality calculated live. Drill down from plant to shift to machine and back up — same number, same definition, every level.

Downtime Management

Automatic downtime detection from machine data. Operators log causes on tablets. Alerts route in real time to maintenance and supervisors — recurring losses surface before they become normalised.

Job Scheduling & Planning

Schedule jobs across machines, track against plan, surface variance alerts as they happen. The schedule on the screen matches the schedule on the floor.

Shift & Operator Tracking

Link output, quality and downtime to specific shifts and operators. Accountability becomes a data structure, not a confrontation.

Production Analytics

Throughput trends, cycle-time analysis, line-balancing insights. The continuous-improvement team starts with the data they used to spend the first week of every project collecting.

Standards & Compliance

Built for the standards your regulators and customers already require.

  • ISO 22400
  • IATF 16949
  • ISO 9001
  • ISA 95

See Production running on your line.

A 30-minute discovery call. A 2–3 week pilot on real factory data. Then scale at your pace.

Demo request

Tell us about your factory.

30-minute call, zero obligation. We map the right Zometric modules to your KPIs and priority areas.

A sentence or two is enough — we'll go deeper on the call.

Prefer to talk now?

Talk to an engineer