Does every high-risk failure have a control that is actually running?
Design and process FMEA on the AIAG-VDA 7-step method, built from linked records instead of spreadsheet rows. Action Priority updates as you rate, and every control carries into the Control Plan.
Action Priority as you rate
Design risk that reaches the process
Controls that reach the shop floor
PFMEA · Motor housing assembly · Step 5
Risk analysisAIAG & VDA 2019 · AP
Failure mode · causeSODAP
OP 30Seal damaged on insertionBurr on housing edge956H
OP 30Bearing not fully seatedPress force below specification843M
OP 40Wrong bearing variant fittedMixed parts at the station732L
Effect from DFMEA · S 9Foundation updated · 2 changes to review
The method
What is an AIAG-VDA FMEA?
Failure Mode and Effects Analysis (FMEA) is a structured, team-based method for finding how a product or process can fail, what each failure would mean for the customer, and which controls prevent or detect it — before launch. The AIAG & VDA FMEA Handbook (first edition, 2019) merged the American and German approaches into one seven-step method that automotive customers expect from suppliers working to IATF 16949.
The seven steps are planning and preparation, structure analysis, function analysis, failure analysis, risk analysis, optimisation and results documentation. A Design FMEA (DFMEA) analyses the product, a Process FMEA (PFMEA) analyses how it is made, and FMEA-MSR (Monitoring and System Response) supplements a DFMEA by analysing how diagnostics detect a fault in use and how the system responds.
Instead of multiplying Severity × Occurrence × Detection into a Risk Priority Number (RPN), the 2019 handbook ranks every failure chain High, Medium or Low Action Priority (AP) from a lookup table that weighs severity first.
Why teams switch
Problems Zometric FMEA removes
Five problems quality teams describe in their own words — and what changes when the FMEA is built on linked records.
01Design and process
Our DFMEA and PFMEA disagree about the same failure.
With Zometric
A PFMEA effect adopted from the DFMEA keeps following its design severity. Raise the severity in the DFMEA and the process chains behind it are re-rated and flagged for review.
Live DFMEA → PFMEA link
02Reuse
Every new part starts as a copy of last year's spreadsheet.
With Zometric
Start from a foundation FMEA or one of eight starter templates. When the foundation improves, every FMEA built on it lists the changes to review.
Foundation FMEAs
03Follow-through
High-priority chains sit open with no action.
With Zometric
AP High chains are flagged until they have an action or a written justification, and an FMEA cannot be marked complete while errors are open.
Action Priority checks
04Shop floor
Controls in the FMEA never reach the shop floor.
With Zometric
Prevention and detection controls generate Control Plan rows. When the PFMEA changes, the Control Plan previews exactly what would change.
Control Plan generation
05Lessons learned
Field failures never make it back into the risk analysis.
With Zometric
The prevention step of a CAPA raises a review flag on the PFMEA it applies to, so the lesson lands in the document that has to change.
CAPA prevention flags
How it works
How an FMEA runs in Zometric
The workspace follows the seven AIAG-VDA steps, so the method is the workflow.
01
Step 1 · Planning and preparation
Plan the analysis
Create a DFMEA or PFMEA inside a project, set its scope, team and rating tables — or start from a foundation FMEA instead of a blank sheet.
02
Step 2 · Structure analysis
Build the structure
A PFMEA takes its process steps and 4M work elements straight from the Process Flow Diagram. A DFMEA builds the system, subsystem and component tree, with a block diagram and a P-diagram.
03
Step 3 · Function analysis
Describe the functions
Attach functions and requirements to each element and link the product and process characteristics from the characteristic register.
04
Step 4 · Failure analysis
Connect the failures
Build failure chains of effect, failure mode and cause. Effects taken from the DFMEA bring their design severity with them.
05
Step 5 · Risk analysis
Rate the risk
Rate Severity, Occurrence and Detection against your rating tables and Action Priority appears as you type. Severity 9–10 chains rated AP High or Medium go to a management review queue.
06
Step 6 · Optimisation
Optimise
Assign prevention and detection actions with owners and due dates, record the predicted rating, then the confirmed rating once the action is done. A proposed control becomes current only when its action is complete.
07
Step 7 · Results documentation
Document and release
Checks flag gaps such as unrated chains or AP High chains without an action. Mark the FMEA complete, generate the step 7 report, and release it through an approval route with an electronic signature.
Want to see FMEA on your own process?
A 30-minute call covers your products, your customers' requirements and the tools you use today.
What it does
FMEA — what you actually get.
Each capability is tied to a decision your team is already trying to make.
The 7-Step AIAG-VDA Method
Planning, structure, function, failure, risk, optimisation and documentation — one workspace with a stepper, structure tree, function net and failure net. The method is the workflow, so the team follows it without a facilitator policing the template.
DFMEA, PFMEA & FMEA-MSR
Block and boundary diagrams, P-diagrams and a design risk grid for DFMEA. Process steps and 4M work elements for PFMEA. Monitoring and system response for FMEA-MSR. One module, one set of rating tables, three analyses.
Action Priority Engine
Rate Severity, Occurrence and Detection against your own rating tables and Action Priority appears the moment you type. An AP High chain needs an action or a written justification, and the highest-severity chains queue for management review.
Design Risk That Follows Into the Process
A PFMEA effect adopted from the DFMEA keeps following it. Raise a design severity and the process chains behind it are re-rated and flagged for review — no more two documents quietly disagreeing about the same failure.
Optimisation Actions & Re-rating
Prevention and detection actions carry an owner, a due date, a predicted rating and a confirmed rating. A proposed control becomes a current control only when its action is completed — so the FMEA shows the risk you have, not the risk you planned.
Foundation FMEAs & Knowledge Library
Start every new program from a foundation FMEA instead of last year's copy. When the foundation changes, each FMEA built on it shows the changes to review — lessons learned reach every program that needs them.
Special Characteristics & Traceability
Follow any characteristic from the DFMEA to the PFMEA, its controls, the Control Plan row and the PPAP evidence. Gaps are flagged on screen: a required special characteristic that was never classified, a severity 10 chain with no characteristic behind it.
AI Assist That Stays Inside Your Walls
Suggested causes, effects and controls drawn from your own FMEAs, CAPAs and lessons learned — each with a citation and a confidence. No external LLM is used in this module, and nothing is written until an engineer accepts it.
In numbers
How Action Priority ranks a failure chain
Action Priority looks up each chain's Severity (S), Occurrence (O) and Detection (D) ratings in the AIAG & VDA 2019 table. Of the 1,000 possible combinations, 318 are High, 214 Medium and 468 Low. Because severity carries the most weight, a chain with a lower RPN can still need action first.
318
High
214
Medium
468
Low
Two failure chains: RPN (S × O × D) compared with Action Priority (AP)
Chain
S
O
D
RPN
AP
A
S9
O6
D2
RPN108
APHigh
B
S4
O6
D5
RPN120
APMedium
Chain A has the lower RPN but the higher priority, because a severity of 9 means a safety or regulatory effect. Zometric computes AP from the 2019 table as you rate; a read-only AIAG 4th-edition view still shows the RPN for customers who ask for it.
Connected modules
How the FMEA connects to the rest of Zometric
Each document is a live view of the same records, so nothing is retyped between them.
Zometric FMEAGenerated from FMEA controls, with a sync preview
Reuse
Spreadsheet templateLast year's file copied and edited
Zometric FMEAFoundation FMEAs with tracked changes to review
History
Spreadsheet templateFile versions and "final_v3" names
Zometric FMEAEvery change recorded with who, when and why; released revisions frozen
Teamwork
Spreadsheet templateOne editor at a time
Zometric FMEASeveral editors with conflict handling, plus a full-screen workshop mode
Checks
Spreadsheet templateNone
Zometric FMEA30 FMEA rules flag gaps before an FMEA can be marked complete
Approval
Spreadsheet templateSignatures on paper or e-mail
Zometric FMEAApproval route with electronic signature
Want to see FMEA on your own process?
A 30-minute call covers your products, your customers' requirements and the tools you use today.
Standards & Compliance
Built for the standards your regulators and customers already require.
AIAG & VDA FMEA Handbook (1st ed., 2019)
IATF 16949:2016
ISO 9001:2015
AIAG APQP (3rd ed.)
AIAG Control Plan (1st ed., 2024)
Integrations
Data in and out
Excel import
Bring legacy PFMEA and DFMEA workbooks in, with automatic column mapping.
Excel round trip
Export an FMEA for editing in Excel and re-import it, with a cell-by-cell comparison before anything is applied.
Forms and exports
AIAG-VDA form sheets on screen, with CSV and Excel download of every form and a print layout for PDF.
REST API
FMEAs, failure chains, ratings, actions and releases are available through the REST API with token-scoped access.
FAQ
FMEA: frequently asked questions
Straight answers to the questions teams ask before a demo.
What is the difference between Action Priority and RPN?
RPN multiplies Severity, Occurrence and Detection into one number, so very different risks can score the same. Action Priority, introduced by the AIAG & VDA FMEA Handbook in 2019, ranks each failure chain High, Medium or Low from a lookup table that weighs severity first. Zometric uses Action Priority by default and keeps a read-only RPN view for customers who still ask for it.
Does Zometric FMEA follow the AIAG & VDA 2019 handbook?
Yes. The workspace follows the seven AIAG-VDA steps, ships the 2019 Action Priority tables for DFMEA, PFMEA and FMEA-MSR, and produces the handbook's form sheets. Rating tables can be duplicated and adjusted to your customers' requirements.
Can we import our existing Excel FMEAs?
Yes. Legacy PFMEA and DFMEA workbooks can be imported with automatic column mapping. An FMEA can also be exported for editing in Excel and re-imported, with a cell-by-cell comparison before changes are applied.
Do the DFMEA and PFMEA stay linked?
Yes. Design failure chains can be adopted into the PFMEA at the operation that makes the characteristic. Adopted effects keep following the DFMEA's severity, and a change in the DFMEA re-rates the PFMEA chains and raises a review flag. To rate an effect differently, you detach it with a written rationale.
What is a foundation FMEA?
A foundation FMEA is a reusable, generic analysis of a process or design, such as press-fitting or welding, that part-specific FMEAs are built from. In Zometric, when a foundation is improved, each FMEA built on it shows the changes to review and lets you take, keep or detach each one. Eight starter templates are included, from press-fit and fastening to injection moulding and packaging.
Can we run FMEA workshops in Zometric?
Yes. Workshop mode shows one failure chain at a time on a full-screen page, records attendance, the chains reviewed and the decisions made, and turns the session into minutes. Only the facilitator edits unless a participant is allowed to edit too.
Does Zometric's AI send our FMEA data to an external AI model?
No. FMEA suggestions for causes, effects and controls are produced by a local engine from your own FMEAs, CAPAs and lessons learned, each with a citation. No external LLM is used, and nothing is written to the FMEA until an engineer accepts it.
Can our customer review the PFMEA without seeing everything?
Yes. Through the Supplier Portal you can share a black-box view of the PFMEA from a secure link. Hidden columns are removed on the server, every page carries a watermark naming the viewer, and download and print are disabled.
See FMEA running on your line.
A 30-minute discovery call. A 2–3 week pilot on real factory data. Then scale at your pace.