Which lots should you accept, and on what evidence?
Incoming and outgoing lot inspection on ANSI Z1.4, Z1.9 and c=0 sampling plans. Zometric works out each sample, judges every characteristic and moves each supplier between Normal, Tightened and Reduced.
Warning · A second rejection in five lots suggests Tightened
The method
What is acceptance sampling inspection?
Acceptance sampling decides whether to accept or reject a whole lot from a random sample of it. Attribute plans count nonconforming units or nonconformities; variable plans measure a characteristic and estimate how much of the lot falls outside its specification. ANSI Z1.4 is the standard for attribute sampling and ANSI Z1.9 for variable sampling. In both, the lot size and the inspection level give a code letter, and the code letter and the Acceptable Quality Level (AQL) give the sample size and the acceptance criteria.
Both standards change the sample as a supplier's results change. Lots start on Normal inspection, move to Tightened after two of five lots are rejected, return to Normal after five accepted in a row on Tightened, and can move to Reduced after ten accepted lots when production is steady and Reduced inspection has been approved. Five lots rejected on Tightened discontinue inspection until the supplier has corrected the cause. c=0 plans, from Squeglia's zero acceptance number tables, accept a lot only when the sample has no nonconformities.
Incoming inspection checks what suppliers deliver, and outgoing inspection checks what you ship. Quality management systems such as ISO 9001 and IATF 16949 expect evidence that product was verified before it is used or released, which is the record an inspection lot leaves behind.
Why teams switch
Problems Zometric Inspection removes
Six problems inspection and supplier-quality teams describe in their own words, and what changes when the sampling standard is built into the workflow.
01Sampling
We look sample sizes up in a photocopied table, and sometimes get them wrong.
With Zometric
Each group in a plan names its standard, inspection level and AQL. The sample size and the acceptance and rejection numbers come from the lot size when the lot is submitted, and are stored with the result.
Sampling standards built in
02Switching
Nobody notices when a supplier should go to tightened inspection.
With Zometric
Each new lot's switching level is worked out from that supplier's earlier lots for the part, across every version of the plan. Five rejections on Tightened block new lots until a corrective action is approved.
Switching from lot history
03Variables
We record measurements, but nobody runs the Z1.9 calculation.
With Zometric
Readings are typed or pasted into a grid. Zometric computes the mean, standard deviation, quality indices and the estimated percent nonconforming, compares it with the standard's limit and gives the reason for a rejection.
ANSI Z1.9 variables
04Approval
Rejected lots get accepted quietly when production is waiting.
With Zometric
The approver's decision is kept next to the system's. Disagreeing needs a reason, and accepting a lot the system rejected is recorded as an approval under deviation.
Two-decision approval
05Traceability
When a customer asks for evidence, we search through folders.
With Zometric
Each lot record holds its batch numbers, PO, GRN and challan numbers, CoC reference and receipt details next to the results, and downloads as a PDF Final Inspection Report.
Lot traceability
06Shop floor
Inspectors don't know which lots are waiting at their bench.
With Zometric
Every inspection station has a worklist of the open lots with characteristics checked there, opened by scanning a QR sticker at the station.
Station worklists
How it works
How an inspection runs in Zometric
A plan is set up once per part and inspection type. Every lot then follows the same path from receipt to a final decision.
01
Step 1 · Masters
Set up the masters
Define parts, parties (suppliers, customers and internal factories), the characteristics you check, inspection stations and the inspection teams that work them.
02
Step 2 · Plan
Build the inspection plan
Create a plan for a part as incoming or outgoing. Add attribute groups on Z1.4, c=0, fixed, percentage or a custom table, and variable groups on Z1.9, then put each characteristic at its station in inspection order.
03
Step 3 · Activate
Bind parties and activate
Bind the suppliers or customers the plan applies to, with their own switching settings if needed, and name the approvers. A plan needs a group, a party and an approver before it can go live.
04
Step 4 · Lot
Create the lot
An inspector enters the lot number, quantity, batches and receipt references. The switching level is fixed when the lot is created, and a Discontinued supplier cannot get a new lot.
05
Step 5 · Inspect
Inspect at each station
Count nonconformities as totals or unit by unit, enter or paste readings, and record serial numbers where the station asks for them. Each characteristic shows its live status against Ac and Re unless the plan uses blind inspection.
06
Step 6 · Submit
Submit for a decision
Zometric derives the sample, judges each characteristic or group and rejects the lot if any group is rejected. Plans can finalise accepted lots, or rejected ones, automatically; the rest wait for an approver.
07
Step 7 · Approve
Approve and report
The approver accepts or rejects with a reason, returns the lot to the inspector for corrections, or asks for a resubmission, which starts from Tightened. Reports and performance by part, party and plan follow.
Want to see Inspection on your own process?
A 30-minute call covers your products, your customers' requirements and the tools you use today.
What it does
Incoming & Outgoing Inspection — what you actually get.
Each capability is tied to a decision your team is already trying to make.
Sampling Standards Built-In
ANSI Z1.4 (attribute AQL — Normal, Tightened, Reduced), ANSI Z1.9 (variable AQL, standard deviation method), c=0 (Squeglia), fixed sample plans, percentage plans and your own custom lot-size tables. Pick the regime, the system handles the math.
Incoming and Outgoing Inspection
Incoming checks what suppliers deliver, outgoing checks what you ship — one plan per part and inspection type, with every characteristic assigned to the station where it is checked.
Mixed Inspection Plans
Forward-computed switching between Tightened, Normal and Reduced regimes based on the lot history. Dual decision model when both attribute and variable plans apply.
Full Traceability
Every inspection record links back to lot, batch, PO, GRN, Challan and Certificate of Conformance. When the customer asks 'show me the evidence,' it is on the lot record and in its PDF report.
Audit Trail on Every Decision
Who accepted, who rejected, with what sample, against what AQL, with what reason. Every change is kept in the record history with who made it and when.
Paperless Workflow
Replace paper and Excel inspection with a browser-based workflow, with station worklists opened from a QR code. The inspector captures once; QA and supplier quality see the same record.
In numbers
How the switching level changes the sample
For a lot of 1,200 parts at General inspection level II, ANSI Z1.4 gives code letter J. With an AQL of 1.0, the level the lot was created at decides how many parts are sampled and how many nonconforming parts are allowed. A c=0 plan with the same index AQL moves one column instead and always accepts on zero.
1,200
Lot size
J
Code letter
1.0
AQL
Lot of 1,200 at level II, AQL 1.0: sample size (n), acceptance (Ac) and rejection (Re) numbers
Level
Z1.4 n
Ac
Re
c=0 n
c=0 AQL
Normal
Z1.4 n80
Ac2
Re3
c=0 n34
c=0 AQL1.0
Tightened
Z1.4 n80
Ac1
Re2
c=0 n47
c=0 AQL0.65
Reduced
Z1.4 n32
Ac1
Re3
c=0 n27
c=0 AQL1.5
On Tightened the Z1.4 sample stays at 80 but only one nonconforming part is allowed, while the c=0 plan moves to the 0.65 column and samples 47. On Reduced, a count between Ac and Re, 2 here, sends the next lot back to Normal. Zometric reads these values from the standard's tables when the lot is submitted and stores them with the result.
Connected modules
How Inspection connects to the rest of Zometric
Inspection plans and lot results are shared with the modules that plan, investigate and answer for quality.
Build, version, activate and deactivate inspection plans, bind parties, name approvers and mark a supplier steady and eligible for Reduced inspection, with who and when recorded. They do not record inspections.
Inspectors
Members of the plan's inspection team create lots, record results at their stations, submit lots and raise corrective actions.
Approvers
Named on the plan, they accept or reject pending lots, return a lot for corrections, request resubmissions and approve the corrective action that lifts a Discontinued supplier.
Resources
Documentation and guides for this module.
Step-by-step guides to configuring the module, running it day to day, and reading what it records.
Zometric Inspection vs paper check sheets and a spreadsheet
Zometric Inspection vs paper check sheets and a spreadsheet
Zometric Inspection vs paper check sheets and a spreadsheet
Check sheet and spreadsheet
Zometric Inspection
Sample size
Check sheet and spreadsheetLooked up in the standard's tables by hand
Zometric InspectionDerived from lot size, inspection level and AQL, and stored with the lot
Switching
Check sheet and spreadsheetTracked from memory, if at all
Zometric InspectionWorked out from each supplier's lot history for the part
Variables
Check sheet and spreadsheetMean and standard deviation on a calculator
Zometric InspectionZ1.9 quality indices and estimated percent nonconforming, with the reason for a rejection
Decision
Check sheet and spreadsheetWritten on the sheet by the inspector
Zometric InspectionSystem decision, then the approver's, with a reason when they differ
Traceability
Check sheet and spreadsheetReceipt numbers kept in a separate register
Zometric InspectionBatches, PO, GRN, challan and CoC reference on the lot record
Plan changes
Check sheet and spreadsheetA new sheet printed while old copies stay in use
Zometric InspectionVersioned plans; sampling changes need a new version
History
Check sheet and spreadsheetCrossed-out corrections
Zometric InspectionEvery change kept with who made it and when
Reports
Check sheet and spreadsheetTyped up afterwards
Zometric InspectionFinal Inspection Report and Report for Approver as PDF
Want to see Inspection on your own process?
A 30-minute call covers your products, your customers' requirements and the tools you use today.
Standards & Compliance
Built for the standards your regulators and customers already require.
ANSI Z1.4
ANSI Z1.9
c=0 (Squeglia)
IATF 16949
ISO 9001
Integrations
Data in and out
Paste from Excel
Plans, groups, characteristics, party bindings, approvers and notification subscribers are set up in flat sheets pasted from Excel, with a check column that shows each row's errors before saving.
Pasted readings
Measurements and unit-by-unit results can be pasted into the lot entry grid from a spreadsheet.
PDF reports
The Final Inspection Report, the Report for Approver and the approver's decision preview, each named by part, lot and date.
CSV download
Performance tables by part, party and plan download as CSV, keeping the filters applied on screen.
Email notifications
Teams or users subscribe, per plan or for all plans, to events such as lots pending approval, lot decisions and corrective actions.
FAQ
Inspection: frequently asked questions
Straight answers to the questions teams ask before a demo.
Which sampling standards does Zometric Inspection support?
Attribute groups use ANSI Z1.4 at inspection levels I to III and S1 to S4, c=0 (Squeglia) zero acceptance number plans, fixed sample plans, percentage plans or a custom lot-size table that you define. Variable groups use ANSI Z1.9 with the standard deviation method. Attribute groups in the same plan can use different standards, while a plan built on a custom table uses it for every group and has no switching.
How does Zometric apply the Z1.4 switching rules?
When a lot is created, Zometric reads the supplier's earlier lots for the same part and inspection type, across every plan version. Two rejections in the last five lots on Normal suggest Tightened, five accepted lots in a row on Tightened return to Normal, and ten accepted lots on Normal suggest Reduced if the supplier has been marked steady and Reduced-eligible. The level is fixed on the lot when it is created.
How does Zometric decide a lot inspected by variables?
For ANSI Z1.9 it computes the sample mean and standard deviation, the upper and lower quality indices, and the estimated percent nonconforming from the standard's table. The characteristic is accepted when that estimate does not exceed the maximum allowed by the standard, and rejected automatically when the mean is outside a specification limit.
Can an approver overrule the system's decision?
Yes. The approver records their own decision next to the system's, and a reason is required whenever the two differ. Accepting a lot the system rejected is stored as an approval under deviation. A plan can also finalise accepted lots, or rejected lots, without an approver.
What happens when a supplier is Discontinued?
After five lots are rejected on Tightened inspection, Zometric suggests Discontinued and blocks new original lots for that supplier and part. Once an approver approves a corrective action, the next lot starts on Tightened. A resubmission of a rejected lot is suggested Tightened and can never run on Reduced.
Can inspectors work without seeing the acceptance numbers?
Yes. A plan can switch on blind inspection, so the acceptance and rejection numbers are not sent to the inspector's page and no live accept or reject status is shown. Approvers and reports always show them.
What happens to open lots when an inspection plan changes?
Sample-defining settings, such as standards, AQLs and specification limits, are locked once a plan is live, so changing them creates a new plan version. When it is activated, open lots with nothing recorded move to the new version, lots already started finish on the old one, and suppliers keep their switching history.
Can we set up inspection plans from Excel?
Yes. Plans, groups, characteristics, party bindings, approvers and notification subscribers can be pasted from Excel into flat sheets keyed by part number and inspection type. A check column validates every row before it is saved. A guided step-by-step builder is also available.
Better Together
Modules that work alongside this one.
Zometric's modules share a single data backbone — adopting more of them compounds the signal-to-noise advantage.