Zometric Logo

Module 17 · Quality

Do your process flow, PFMEA and Control Plan all describe the same process?

The process flow is where quality planning starts, so Zometric makes it the single definition of the process. Each step is one record — drawn in the diagram, listed in the table, analysed in the PFMEA and controlled in the Control Plan. Renumber an operation once and every document follows.

Demo request

Tell us about your factory.

30-minute call, zero obligation. We map the right Zometric modules to your KPIs and priority areas.

Prefer to talk now?

See all modules

What it does

Process Flow Diagram — what you actually get.

Six capabilities, each tied to a decision your team is already trying to make.

Table and Diagram, One Object

Edit in whichever view suits the conversation. Add, connect and reorder steps directly in the diagram — by mouse or keyboard — and the table changes with it. Auto layout keeps it readable; export to PNG or SVG when a customer asks for the picture.

Steps Shared With PFMEA & Control Plan

A process step is never retyped. The same step anchors the failure chains in the PFMEA and the rows in the Control Plan, so "OP 30" means one thing everywhere. Renumbering shows a preview of everything it touches before you apply it.

4M Work Elements

Man, machine, material and environment captured per step, ready to become the cause level of the PFMEA. The structure analysis is done once, at the point where the process is actually being described.

Characteristics at Every Step

Link the product and process characteristics each step creates or affects, straight from the characteristic register, along with incoming materials. Special characteristics keep their symbol from the drawing through to the shop floor.

Rework, Repair & Scrap Paths

Model the flow the plant really runs — sub-steps, rework loops, repair stations and scrap exits — not just the happy path. Rework steps are carried into the risk analysis and the Control Plan instead of being forgotten.

Error-Proofing Device Register

Every poka-yoke device recorded against the step it protects, with the master samples used to verify it. Verification becomes a Control Plan row — so the device that prevents the defect is itself under control.

Checks With One-Click Fixes

Unreachable steps, a characteristic no operation makes, a flow with no end — found as you work and listed with a Fix button. Start with a preliminary flow chart during quoting and promote it to the process flow when the program is awarded.

Standards & Compliance

Built for the standards your regulators and customers already require.

  • IATF 16949
  • AIAG APQP
  • AIAG-VDA FMEA Handbook
  • AIAG Control Plan

See Process Flow Diagram running on your line.

A 30-minute discovery call. A 2–3 week pilot on real factory data. Then scale at your pace.

Demo request

Tell us about your factory.

30-minute call, zero obligation. We map the right Zometric modules to your KPIs and priority areas.

Prefer to talk now?

Talk to an engineer